An official website of the United States government
Here's how you know
Official websites use .mil
A
.mil
website belongs to an official U.S. Department of Defense organization in the United States.
Secure .mil websites use HTTPS
A
lock (
lock
)
or
https://
means you’ve safely connected to the .mil website. Share sensitive information only on official, secure websites.
Skip to main content (Press Enter).
US Army Corps of Engineers
New England District Website
®
About
About
Mission
History
Leadership
Business With Us
Contracting
NAE Vertical Construction Industry Day
Contracting Actions
Small Business
Federal Business Opportunities
Missions
Missions
Civil Works
Navigation
Flood Risk Management
Shore Bank Protection
Connecticut
Maine
Massachusetts
New Hamsphire
Rhode Island
Vermont
Civil Works Review Plans
Public Notices
Military Programs
Projects/Topics
Hartford-EastHartford-Levee-Rehab-Study
Former Loring Air Force Base (AFB) Laundry Annex
Former Charlestown Naval Auxiliary Landing Field
Former Charlestown Naval Auxiliary Landing Field Explosive Safety
Recreation
Connecticut
Massachusetts
New Hampshire
Vermont
Regulatory
Public Notices
Permits Issued
Orsted/Revolution Wind, LLC (Oct. 2023)
State General Permits
Jurisdiction and Wetlands
Jurisdictional Determinations
Mitigation
Invasive Species
Dredged Material Program
Stream and River Continuity
Naturalized River Restoration
Vernal Pools
Useful Documents, Forms and Publications
Useful Links and Regulations
WRDA214
Submitting-Electronic-Correspondence
Emergency Situations
Historic and Tribal Resources
Navigation
Public Notices
Connecticut Projects
Maine Projects
Massachusetts Projects
New Hampshire Projects
New York Projects
Rhode Island Projects
Public Services
Continuing Authorities Program
Section 204
Section 206
Section 111- Mitigation of Shoreline Erosion
Ecosystem Restoration Authorities
Flood Plain Management Services
Planning Assistance to States
Project Partnership Agreements
Emergency Operations
Disposal Area Monitoring System (DAMOS)
Beneficial Use of Dredged Material
Beneficial Use Planning Map
Beneficial Use Resources
Reservoir Control Center
Section 408
Real Estate Division
Locations
USACE Locations
Careers
Careers
Employee Information
Equal Employment Opportunity
Media
Media
News Releases
State Update Reports
Images
Yankee Engineer
Contact
Contact
USACE Office Locator
Library
RSS
Home
/
Missions
/
Projects/Topics
/
Former Fort Devens Environmental Cleanup
/
Document Menus
Document Repository
2020 Annual Reports
AOC 50
SHL
Main Post
Base-Wide Preliminary Assessment for Evaluation of Perfluoroalkyl Substances
Fort Devens RAB Fact Sheets
CERCLA Fact Sheet (February 2021)
PFAS Private/Community Well Sampling Update (November 2020)
(NEW) - Fort Devens Project Status Update - 2020-09
PFAS Investigation and Action Status – Former Fort Devens, 2020-07
MassDEP Fact Sheet, PFAS in Drinking Water: Questions and Answers for Consumers, Massachusetts Department of Environmental Protection, 2018-03-01
Fact Sheet, PFOA & PFOS Drinking Water Health Advisories, U.S. Environmental Protection Agency, 2016-11
Fort Devens RAB Fact Sheet - 2021-06
Final Debris Area Plan
Shepley’s Hill Landfill
Final SHL Arsenic Treatment Plant Pilot Test
Final Phase 1 EPA SOW Demonstrate Plume Capture Tech Memo 2.d
Final Phase 1 EPA SOW Demonstrate Plume Capture Tech Memo 1.g
Final Phase I EPA SOW Demonstrated Plume Capture Tech Memo 4.e
Final LUCIP Addendum for Former Housing Areas
RAB Meeting Minutes
Restoration Advisory Board (RAB) Meeting Minutes, 24 January 2019, U.S. Army Corps of Engineers, 2019-04-03
Restoration Advisory Board (RAB) Meeting Minutes, 18 October 2018, U.S. Army Corps of Engineers, 2018-10-18
Restoration Advisory Board (RAB) Meeting Minutes, 25 April 2019, U.S. Army Corps of Engineers, 2019-05-28
Restoration Advisory Board (RAB) Meeting Minutes, 25 July 2019, U.S. Army Corps of Engineers, 2019-07-25
Restoration Advisory Board (RAB) Meeting Minutes, 17 October 2019, U.S. Army Corps of Engineers, 2019-10-17
Restoration Advisory Board (RAB) Meeting Minutes, 16 January 2020, U.S. Army Corps of Engineers, 2020-01-16
Restoration Advisory Board (RAB) Meeting Minutes, 19 November 2020, U.S. Army Corps of Engineers, 2020-11-19
Restoration Advisory Board (RAB) Meeting Minutes, 25 February 2021, U.S. Army Corps of Engineers, 2021-2-25
Restoration Advisory Board (RAB) Meeting Minutes, 25 February 2021, U.S. Army Corps of Engineers, 2021-5-20
Restoration Advisory Board (RAB) Meeting Minutes, 19 August 2021, U.S. Army Corps of Engineers, 2021-8-19
RAB Presentations
Former Fort Devens Army Installation, Project Status Update, 18 January 2018, U.S. Army Corps of Engineers, 2018-01-18
Former Fort Devens Army Installation, Project Status Update, 12 April 2018, U.S. Army Corps of Engineers, 2018-04-12
Former Fort Devens Army Installation, Project Status Update, 19 July 2018, U.S. Army Corps of Engineers, 2018-07-19
Former Fort Devens Army Installation, Project Status Update, 18 October 2018, U.S. Army Corps of Engineers, 2018-10-18
Former Fort Devens Army Installation, Project Status Update, 24 January 2019, U.S. Army Corps of Engineers, 2019-01-24
Former Fort Devens Army Installation, Project Status Update, 25 April 2019, U.S. Army Corps of Engineers, 2019-04-25
Former Fort Devens Army Installation, Project Status Update, 25 July 2019, U.S. Army Corps of Engineers, 2019-07-25
Former Fort Devens Army Installation, Project Status Update, 17 October 2019, U.S. Army Corps of Engineers, 2019-10-17
Former Fort Devens Army Installation, Project Status Update, 16 January 2020, U.S. Army Corps of Engineers, 2020-01-16
Former Fort Devens Army Installation, Project Status Update, 19 November 2020, U.S. Army Corps of Engineers, 2020-11-19
Former Fort Devens Army Installation, RAB Meeting, 25 February 2021, U.S. Army Corps of Engineers, 2021-02-25
Former Fort Devens Army Installation, RAB Meeting, 19 August 2021, U.S. Army Corps of Engineers, 2021-08-19
PFAS Plans and Reports
Final Site Inspection (SI) Addendum for Additional PFAS Sampling, Former Fort Devens, BERS-Weston Services, JVA, LLC, 2018-08-03
Final Site Inspection (SI) Report for PFAS, Former Fort Devens, BERS-Weston Services, JVA, LLC, 2018-05-22
Final Area 2 Field Sampling Plan, Addendum to Remedial Investigation Work Plan for PFAS, Former Fort Devens, KOMAN Government Solutions, LLC, 2018-12
Final Area 1 Field Sampling Plan, Addendum to Remedial Investigation Work Plan for PFAS, Former Fort Devens, KOMAN Government Solutions, LLC, 2018-09
Time-Critical Removal Action
Action Memorandum for Time-Critical Removal Action for Former Fort Devens, Devens, Massachusetts, U.S. Army Corps of Engineers, 2019-03-15
Community Involvement Plan
Former Fort Devens Community Involvement Plan - Final (2020)
Five-Year Reviews/Public Notices
2020 Five-Year Review Public Notice
2015 Five-Year Review
2020 Five-Year Review
2021 FYR for Former Fort Devens, Sudbury Training Annex, AOC A7
EPA Concurrence - Draft Fifth Five-Year Review Report for Former Sudbury Training Annex for AOC A7, Sudbury, Massachusetts
Area 1 PFAS Remedial Investigation (RI) Data
AOC 57 Soil Results, U.S. Army Corps of Engineers
AOC 57 Water Results, U.S. Army Corps of Engineers
AOC 57 Water Results CSB Stage 2A Validation
AOC 74 Water Results CSB Stage 2A Validation
AOC 74 Water Results, U.S. Army Corps of Engineers
AOC 74 Soil Results, U.S. Army Corps of Engineers
AOC 74 Water Results Stage 2A Validation
AOC 75 Soil Results, U.S. Army Corps of Engineers
AOC 75 Water Results CSB Stage 2A Validation
AOC 75 Water Results, U.S. Army Corps of Engineers
AOC 75 Water Results Stage 2A Validation
Grove Pond Soil Results, U.S. Army Corps of Engineers
Grove Pond Water Results, U.S. Army Corps of Engineers
Surface Water and Sediment, U.S. Army Corps of Engineers
Area 1 Preliminary Site Characterization Summary
Area 1 Preliminary Site Characterization Summary Cover Letter
Area 2 PFAS Remedial Investigation (RI) Data
AOC 5 Water Results, U.S. Army Corps of Engineers
AOC 32/43A Soil Results, U.S. Army Corps of Engineers
AOC 32/43A Water Results, U.S. Army Corps of Engineers
AOC 43G Soil Results, U.S. Army Corps of Engineers
AOC 43G Water Results, U.S. Army Corps of Engineers
AOC 43J Water Results, U.S. Army Corps of Engineers
AOC 43J Water Results Stage 2A Validation
AOC 69W/76 Water Results, U.S. Army Corps of Engineers
AOC 76 Soil Results, U.S. Army Corps of Engineers
Area 2 Surface Water and Sediment Results, U.S. Army Corps of Engineers
Area 2 Surface Water and Sediment Results Stage 2A Validation, U.S. Army Corps of Engineers
DCL Water Results, U.S. Army Corps of Engineers
MacPherson Well Water Results, U.S. Army Corps of Engineers
Patton Well Soil Results, U.S. Army Corps of Engineers
Patton Well Soil Results Stage 2A Validation, U.S. Army Corps of Engineers
Patton Well Water Results, U.S. Army Corps of Engineers
Shabokin Well Water Results, U.S. Army Corps of Engineers
Shabokin Well Water Results Stage 2A Validation, U.S. Army Corps of Engineers
Shabokin Surface Water and Sediment Results Stage 2A Validation, U.S. Army Corps of Engineers
Area 2 Preliminary Site Characterization Summary - September 2020
Area 3 PFAS Remedial Investigation (RI) Data
AOC 20 Water Results, U.S. Army Corps of Engineers
AOC 30 Soil Results, U.S. Army Corps of Engineers
AOC 21 Soil Results, U.S. Army Corps of Engineers
AOC 20 Soil Results, U.S. Army Corps of Engineers
AOC 21 Water Results, U.S. Army Corps of Engineers
AOC 30 Water Results, U.S. Army Corps of Engineers
AOC 31 Soil Results, U.S. Army Corps of Engineers
AOC 31 Water Results, U.S. Army Corps of Engineers
AOC 50 Soil Results, U.S. Army Corps of Engineers
AOC 50 Water Results, U.S. Army Corps of Engineers
Area 3 Surface Water and Sediment Results, U.S. Army Corps of Engineers
Fort Devens PFAS RI Area 3 Preliminary Site Characterization Summary
Town Municipal Water Supply Well Data
Municipal Water Supply Results, U.S. Army Corps of Engineers
Background Sampling
Background Surface Water and Sediment Results, U.S. Army Corps of Engineers
Removal Site Evaluation and Reference Document
Historical Records Review (HRR) - 2008
Closed Transferring and Transferred (CTT) - 2003
MA State Police Reports
DESR 6055.9 Edition 1
Devens Soil Mgmt and UXO Policies and Procedures (Rev. 9/2020)
Site Inspection Report (SI) - 2011
Preliminary Assessment Site Inspection (PASI) - 2008
Final Removal Site Evaluation - 2021
Figures
AOC 74 Preliminary Results, Devens PFAS RI, KOMAN Government Solutions, LLC, 2019-03-19
AOC 43G Preliminary Results, Devens PFAS RI, KOMAN Government Solutions, LLC, 2019-03-22
AOC 43J Preliminary Results, Devens PFAS RI, KOMAN Government Solutions, LLC, 2019-04-02
AOC 57 Preliminary Results, Devens PFAS RI, KOMAN Government Solutions, LLC, 2019-04-02
AOC 75 Preliminary Results, Devens PFAS RI, KOMAN Government Solutions, LLC, 2019-03-07
AOC 76 Preliminary Results, Devens PFAS RI, KOMAN Government Solutions, LLC, 2019-03-22
AOC32/43A Vertical Profiling Locations, Devens PFAS RI, KOMAN Government Solutions, LLC, 2018-11-16
Grove Pond Area Preliminary Results, Devens PFAS RI, KOMAN Government Solutions, LLC, 2019-03-22
MacPherson and Town of Ayer Wells Preliminary Results, Devens PFAS RI, KOMAN Government Solutions, LLC, 2019-03-22
Devens PFAS Investigation Areas and Sites, KOMAN Government Solutions, LLC, 2019-06-28
Area 1 Soil Sampling Results, Devens PFAS RI, KOMAN Government Solutions, LLC, 2020-01-10
Area 1 Surface Water and Sediment Results, Devens PFAS RI, KOMAN Government Solutions, LLC, 2020-01-10
Area 2 Soil Sampling Results, Devens PFAS RI, KOMAN Government Solutions, LLC, 2020-01-10
Area 2 Surface Water and Sediment Sampling Results, Devens PFAS RI, KOMAN Government Solutions, LLC, 2020-01-10
Area 3 Soil Sampling Results, Devens PFAS RI, KOMAN Government Solutions, LLC, 2020-01-10
Area 3 Surface Water and Sediment Sampling Results, Devens PFAS RI, KOMAN Government Solutions, LLC, 2020-01-16
Updated 8/24/2021