State |
Description |
Response Date
|
CT |
15-Day Public Notice - ACCESS TO U.S. ARMY CORPS OF ENGINEERS CIVIL WORKS PROJECT PURSUANT TO 33 USC 408 MODIFICATIONS TO RAILROAD CLOSURE STRUCTURE #1 LOCATED IN HARTFORD, CONNECTICUT Interested parties are hereby notified that the U.S. Army Corps of Engineers, New England District (USACE) is evaluating plans pursuant to 33 U.S.C. 408 (Section 408) to allow the city of Hartford to modify Closure Structure #1 of the Connecticut River Right Bank – Hartford, CT Flood Damage Reduction Levee System (levee system) in Hartford, CT. |
4/28/2023 |
MA |
30-Day Public Notice - Maintenance Dredging Of The Cape Cod Canal Federal Navigation Project, Bourne And Sandwich, Massachusetts
Interested parties are hereby notified that the U.S. Army Corps of Engineers (USACE), New England District, plans to perform work in the navigable waters of this District, under the provisions of Section 404 of the Clean Water Act of 1977 (P.L. 95-217) and subject to the requirements of the National Environmental Policy Act (P.L. 91-190). The work involves maintenance dredging of the Cape Cod Canal Federal Navigation Project (FNP) in Bourne and Sandwich, Massachusetts and is authorized by the River and Harbor Acts of 1935, 1945, and 1958. |
3/11/2023 |
MA |
30-Day Public Notice - Maintenance Dredging Of The Essex River Federal Navigation Project Essex, Massachusetts
Interested parties are hereby notified that the U.S. Army Corps of Engineers (USACE), New England District plans to perform work in the navigable waters of this District, subject to the provisions of Section 404 of the Clean Water Act of 1977 (Public Law (P.L.) 95-217); Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (P.L. 92-532); and subject to the requirements of the National Environmental Policy Act (P.L. 91-190). The work involves maintenance dredging of the Essex River Federal Navigation Project (FNP) in Essex, Massachusetts, and is authorized in accordance with Title 33, Parts 335-338 of the Code of Federal Regulations. The FNP was authorized by the River and Harbor Act of 13 July 1892 and was recently amended by the Water Infrastructure Improvements for the Nation (WIIN) Act of 16 December 2016. Attachment 1 lists pertinent laws, regulations, and directives.
|
2-26-2023 |
MA |
30-Day Public Notice - Pedestrian Bridge Construction, East Brimfield Lake, East Brimfield, Massachusetts
Interested parties are hereby notified that the U.S. Army Corps of Engineers (USACE), New
England District plans to perform work at the East Brimfield Lake Flood Risk Management Project subject to the requirements of the National Environmental Policy Act (P.L. 91-190). The work involves the establishment of a pedestrian bridge over the Quinebaug River at East Brimfield Lake in East Brimfield, Massachusetts by the Brimfield Trail Association (Figure 1) under USACE’s Challenge Partnership Program, which is authorized by Public Law 102-580, Section 225 of 33 U.S.C 2328, Water Resources Development Act of 1992. Attachment No. 1 lists pertinent laws, regulations, and directives. |
3/03/2023 |
MA |
30 Day Public Notice - Maintenance Dredging of the Essex River Federal Navigation Project Essex, Massachusetts
Interested parties are hereby notified that the U.S. Army Corps of Engineers (USACE), New England District plans to perform work in the navigable waters of this District, subject to the provisions of Section 404 of the Clean Water Act of 1977 (Public Law (P.L.) 95-217); Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (P.L. 92-532); and subject to the requirements of the National Environmental Policy Act (P.L. 91-190).
|
2/26/2023 |
ME |
30 Day Public Notice - Maintenance Dredging of the Wells Harbor Federal Navigation Project, Wells, Maine.
Interested parties are hereby notified that the U.S. Army Corps of Engineers (USACE), New
England District, plans to perform work in the navigable waters of this District, subject to the
provisions of Section 404 of the Clean Water Act of 1977 (P.L. 95-217), and subject to the
requirements of the National Environmental Policy Act (P.L. 91-190). The work involves
maintenance dredging of the Wells Harbor Federal Navigation Project (FNP) entrance channel,settling basins, inner harbor channel, and anchorage area in Wells, Maine and is authorized in accordance with Title 33, Parts 335-338 of the Code of Federal Regulations.
|
2/13/2023 |
CT |
30-Day Public Notice Maintenance Dredging Of The Milford Harbor Federal Navigation Channel Milford, Connecticut
Interested parties are hereby notified that the U.S. Army Corps of Engineers (USACE), New England District plans to perform work in the navigable waters of this District, subject to the provisions of Section 404 of the Clean Water Act of 1977 (Public Law (P.L.) 95-217); Section 103 of the Marine Protection, Research, and Sanctuaries Act of 1972 (P.L. 92-532); and subject to the requirements of the National Environmental Policy Act (P.L. 91-190). The work involves the removal of approximately 75,000 cubic yards (cy) of silt/clay and sandy material, over an area of about 16 acres, to address shoaling of the Federal Navigation Project (FNP) and associated anchorages in Milford Harbor, Milford, Connecticut.
|
1/18/2023 |
CT |
32-Day Public Notice - Interested parties are hereby notified that the U.S. Army Corps of Engineers (USACE), New England District, is planning to demolish the Mansfield Hollow Dam Operator’s Quarters, found at 141 Mansfield Hollow Road, Mansfield, Connecticut 06250. |
5/24/2022 |
MA |
15-Day Public Notice - 33 U.S.C. 408 (Section 408) to allow the Springfield Water and Sewer Commission (SWSC) to construct a sewage transfer pipeline to connect an existing main interceptor sewer to their new Connecticut River sewer crossing at York Street in Springfield, Massachusetts.
|
|
5/2/2022 |
RI |
30 Day Public Notice - Interested parties are hereby notified that the U.S. Army Corps of Engineers (USACE), New
England District has completed the Rhode Island Coastline Coastal Storm Risk Management
(CSRM) Draft Integrated Feasibility Report and Environmental Assessment (IFR/EA). |
03/21/2022 |
VT |
30 Day Public Notice - Interested parties are hereby notified that the U.S. Army Corps of Engineers (USACE), New England District is evaluating plans for the performance of work at the Ball Mountain Lake Flood Risk Management Project, subject to the requirements of the National Environmental Policy Act (P.L. 91-190). |
2/28/22 |
MA |
Aquatic Ecosystem Restoration Project - Hix Bridge Project, Westport River, Westport, MA: The work involves the removal of stone debris within the East Branch of the
Westport River (Westport, MA) in the vicinity of Hix Bridge to restore connectivity to the
upstream and downstream portions of the Westport River. |
2/12/22 |
NH and ME |
30 Day Public Notice - Interested parties are hereby notified that the U.S. Army Corps of Engineers (USACE), New England District, plans to perform work in the navigable waters of this District, subject to the provisions of Section 404 of the Clean Water Act of 1977 (P.L. 95-217) and subject to the requirements of the National Environmental Policy Act (P.L. 91-190). The work involves the maintenance and repair of three breakwater structures located on the Isles of Shoals (Star Island, Cedar Island, Smuttynose Island, and Malaga Island) in Rye, New Hampshire and Kittery, Maine. The project is authorized by acts of 3 March 1821, 7 May 1822, and the River and Harbor Acts of 13 June 1902 and 25 June 1910. Attachment No. 1 lists pertinent laws, regulations, and directives. |
1/31/22 |
MA |
30 Day Public Notice - The proposed occupation involves frequent and regular vessels transits through the New Bedford Hurricane Barrier for the delivery of offshore wind components from the New Bedford Marine Commerce Terminal at the Port of New Bedford to the Vineyard Wind offshore wind project installation site. |
6/3/21 |
MA |
30 Day Public Notice - Interested parties are hereby notified that the U.S. Army Corps of Engineers (USACE), New England District plans to perform work in the navigable waters of this District, subject to the provisions of Section 404 of the Clean Water Act of 1977 (P.L. 95-217), and to the requirements of the National Environmental Policy Act (P.L. 91-190). The work involves beach nourishment of Town Neck Beach in Sandwich, Massachusetts that has eroded as a result of the Cape Cod Canal Federal Navigation Project (FNP) jetties at the east entrance of the Canal. The work is authorized by Section 111 of the River and Harbor Act of 1968 (Public Law 90-483), as amended. Attachment No. 1 lists pertinent laws, regulations, and directives. |
4/3/21 |