Regulatory/Permitting Public Notices

  • NAE-2005-1142

    Expiration date: 10/13/2016

    25 projects have applied for funding through New Hampshire’s In-Lieu Fee program, the Aquatic Resource Mitigation Fund. The sponsor for the program is the New Hampshire Department of Environmental Services. The program serves as an alternative form of compensation for impacts to aquatic resources

  • NAE-2016-00006

    This notice concerns guidance for compensatory mitigation for impacts to aquatic resources associated with Department of the Army permits in New England.  The Army Corps of Engineers New England District has periodically revised and updated its compensatory mitigation guidance, most recently July

  • NAE-2016-01726

    Expiration date: 9/14/2016

    15-DAY NOTICE: The Town of Phillips, ME  has submitted a permit application for  proposed work in Warm Brook off Reeds Mill Road. The work involves placement of permanent and temporary fill below the ordinary high water line of Warm Brook in conjunction with the insertion of an open-bottom, 3-sided

  • NAE-1991-1909-M1

    Expiration date: 9/29/2016

    State of Maine, Bureau of General Services, has submitted a permit application for work in freshwater wetlands off 2828 Bennoch, Old Town, ME.  The work involves the expansion of the Juniper Ridge Landfill.

  • Issuance of CT General Permits

    Expiration date: 8/19/2021

    The New England District, U.S. Army Corps of Engineers hereby announces issuance of the attached statewide Connecticut General Permits, pursuant to 33 CFR Part 325.5(c)(1) for minimal impact projects. The CT GPs replaces the prior statewide permit, which expired on July 15, 2016, with a series of

  • NAE-2010-02215

    Expiration date: 9/15/2016

    The National Audubon Society has submitted eight projects for funding through the Connecticut In Lieu Fee (“ILF”) program.  Projects include Connecticut River Service Area; Housatonic Service Area; South Central Service Area; Southeast Coast Service Area; Southwest Coast Service Area; and Thames

  • NAE-2016-0390

    Expiration date: 9/9/2016

    Charles Lagasse of Provincetown Marina LLC, has submitted a permit application to conduct work in the Provincetown Harbor.  The proposed work at Fisherman's Wharf includes pier work; dredging; and establishment of a reconfiguration zone.  The Marina also requests two (2) unauthorized structures

  • NAE-1998-02651

    Expiration date: 9/9/2016

    The Town of Provincetown has submitted a permit application to conduct work in the Provincetown Harbor.  The proposed work at MacMillan Wharf includes two wave attenuators; North and South docks: and dredging to deepen the marina basin.  The town also requests ten (10) unauthorized structures on the

  • NAE-2007-02926

    Expiration date: 8/25/2016

    The Massachusetts Department of Fish & Game (DFG) has submitted a prospectus to amend the Massachusetts In-lieu Fee Program Instrument.  The prospectus includes restoration of approximately ½ acre of eelgrass in Salem Sound and Boston Harbor to compensate for authorized impacts to waters of the

  • NAE-2004-4187

    Expiration date: 8/18/2016

    The Town of Barnstable,  MA, has submitted a permit application for proposed work in Maraspin Creek, Barnstable Harbor and Sandy Neck.  This is a request for modification to the existing 2008 permit  to allow maintenance dredging of the Mid-Entrance Channel located in Barnstable Harbor.  The town