The Strand/BRC Group, LLC, has submitted a permit application for proposed work in the West Branch of Stamford Harbor and East Creek in Stamford, CT. Work will consist of installing a 854-foot bulkhead to replace existing rip-rap revetment on the east side of the site to stabilize an eroding and subsiding shoreline.