  • NAE-2017-00732

    Expiration date: 8/10/2017

    CPB2, LLC has submitted a permit application to conduct work in Portland Harbor, Portland, ME.  The work consists of redeveloping and expanding an existing recreational marina from  a 69 to 141-slip facility and associated waterfront re-development.

  • NAE-2006-02309

    Expiration date: 8/11/2017

    Mashpee Neck Marina has submitted a permit application to conduct work in Shoestring Bay. The work involves replacement of existing  bulkheads, boat ramp relocation, a boat wash, dredging, reconfiguration and expansion of existing float system, relocation of a existing fuel dock and other ancillary

  • NAE-2017-01092

    Expiration date: 7/17/2017

    Project SHARE has submitted a permit application to conduct work in the West Branch Sheepscott River, China, ME;  Narraguagus River, Devereaux, ME and Barrows Stream, Crawford, ME.  The work is in conjunction with the Atlantic Salmon Habitat And River Enhancement project.

  • NAE-2009-02719

    Expiration date: 8/3/2017

    Fairhaven Shipyard Companies, Inc., has submitted a permit application to conduct work in New Bedford Harbor to replace an existing floating dock.  The project will increase the upland service area of the shipyard.

  • NAE-2014-01260

    Expiration date: 7/26/2017

    Burlington Harbor Marina, LLC, of Burlington, VT, has submitted an application to place and maintain a new 160-slip, full-service, public marina facility in Burlington Harbor of Lake Champlain off Penny Lane in Burlington.

  • NAE-2010-02215

    Audubon Connecticut In Lieu Fee Program 2016 Annual Report.  The program serves as an alternative form of compensation for impacts to aquatic resources resulting from work authorized by the Army Corps of Engineers New England District.

  • NAE-2009-01349

    Ducks Unlimited, Vermont In-Lieu Fee Program 2016 Annual Report. The In-lieu Fee program serves as an alternative form of compensation for impacts to aquatic resources authorized by USACE and/or the State of Vermont Department of Environmental Conservation.

  • Proposed Reissuance of the Department of the Army Vermont General Permit

    Expiration date: 7/15/2017

    USACE New England proposes to reissue the statewide Vermont General Permit with a series of multiple GPs covering activity-specific categories. The revised GPs will continue to authorize activities in waters of the US within Vermont with minimal individual and cumulative adverse environmental

  • NAE-2011-00212

    Expiration date: 6/29/2017

    Reissued for Minor Changes to the Projects dredging footprint. Quincy Shipyard has submitted a permit application for work in the Fore River, Quincy, MA.  The work involves expansion and modification to the authorized dredging footprint at and adjacent to Pier 1 to create a turning basin to

  • NAE-2016-00232

    Expiration date: 6/26/2017

    John Fennelly has submitted a permit application to perform work in Buzzards Bay, Westport, MA.  Work involves structures below the mean high tide line to create a submerged longline oyster farm located on a 25-acre lease site.