Regulatory/Permitting Public Notices

  • NAE-2017-02375

    Expiration date: 3/8/2018

    The Town of Dartmouth, MA has submitted a permit application to conduct work in Apponagansett Bay for reconstruction of the Dartmouth Maritime Center located at 0 Water Street.  Work will consist of construction of a pile-supported deck; gangway ramp; removal and replacement of the existing float

  • NAE-2017-00897

    Expiration date: 3/1/2018

    Washington West, LLC of West Hartford, CT, has submitted a permit application to conduct work in the tributary located at Washington Street and Plaza Drive, Middletown, CT.  The work consists of discharge of fill material into the stream to allow for commercial development. 

  • NAE-2017-01238

    Expiration date: 2/13/2018

    Quonset Development Corporation has submitted a permit application to work in the Port of Davisville in North Kingstown, RI.  The work will consist of installing a pile-supported pier extension as well as removing and replacing the existing pier wall.  Repairs are necessary to support and maintain

  • NAE-2016-01163

    Expiration date: 3/1/2018

    Eversource Energy of Westwood, MA, has submitted a permit application to work within Boston Harbor between Conley Terminal and Deer Island.  The work will consist of installing a replacement 115k V cable from K Street to the Deer Island wastewater treatment facility.  Removal or abandonment of the

  • NAE-2005-01142

    The State of New Hampshire Aquatic Resource Mitigation Fund, RSA Chapter 482A, Fiscal Year 2017 Report is now available. The in-lieu fee  program serves as an alternative form of compensation for impacts to aquatic resources authorized by the New England District Army Corps of Engineers and/or the

  • NAE-2005-1143

    The report is submitted by the Maine Department of Environmental Protection through its administrator, The Nature Conservancy-Maine, to the U.S. Army Corps of Engineers on December 13, 2017. The program serves as an alternative form of compensation for impacts to aquatic resources resulting from

  • NAE-2017-02083

    Expiration date: 1/19/2018

    Atlantic Clam Farms of Greenwich, CT has submitted a permit application to conduct work in the waters of Long Island Sound (Payea Reach) approximately 3400 feet southeast of Great Captains Island.  The project involves the installation of lines, buoys, anchors and aids to navigation for the

  • NAE-2016-02126

    Expiration date: 1/12/2018

    Vermont Agency of Transportation; waterway & loc:  Lake Champlain & Malletts Creek at the Interstate I-89, Colchester, VT.

  • NAE-2017-00205

    Expiration date: 12/21/2017

    POSTPONEMENT OF PUBLIC HEARING - NIANTIC BAY SHELLFISH FARM, LLC

  • NAE-2016-00933

    Expiration date: 12/21/2017

    Vermont Agency of Transportation has submitted a permit application to conduct work in Lake Champlain in conjunction with the replacement of the North Hero-Grand Island Bridge.  The purpose of the work is to replace an existing deteriorating bridge and provide a safe, efficient roadway for the