New England News Releases

USACE Proceeding with Phase I Design at Camp Ellis Shoreline Mitigation Project
2/6/2025
The U.S. Army Corps of Engineers, New England District (USACE) is pleased to share that it is proceeding with designs for Phase I of the Camp Ellis Beach Shoreline Damage Mitigation Project. Phase I...
USACE, MassDOT, and FHWA Sign Agreement for Sagamore Bridge Replacement
10/4/2024
The U.S. Army Corps of Engineers (USACE), Massachusetts Department of Transportation (MassDOT), and the Federal Highway Administration (FHWA) have signed a Memorandum of Agreement (MOA) for the...
PUBLIC NOTICE OF INTENT TO CONDUCT A FIVE-YEAR REVIEW OF THE OSBORNE POND FORMERLY USED DEFENSE SITE (FUDS) AT JOINT BASE CAPE COD
8/27/2024
Interested parties are hereby notified that the U.S. Army Corps of Engineers, New England District (USACE) is conducting a five-year review (FYR) of the Osborne Pond Formerly Used Defense Site (FUDS)...

Top Rotator

Local bird watchers descended upon West Hill Dam armed with pen, paper and a few binoculars to participate in West Hill Dam’s annual Backyard Bird Count.
Construction of the System Management Engineering Facility (SMEF), the 40,000 square foot, 2-story addition, is well underway and progressing rapidly.
For vessels wanting to enter Plymouth waters, dredging to remove shoals from the Plymouth Harbor federal navigation project in Massachusetts is currently underway and on schedule.

News From Around the Corps

Army Civil Works senior leader gets updates on LA River Ecosystem Restoration Project
3/28/2025
Robyn Colosimo, senior official performing the duties of the assistant secretary of the Army for Civil Works, visited three reaches of the Los Angeles River Feb. 27 to receive a close-up look at the...
Army senior leader tours Whittier Narrows, Prado dams
3/28/2025
An Army senior leader joined a group of U.S. Army Corps of Engineers leaders and subject-matter experts to tour two dams March 4 in USACE Los Angeles District’s area of operations...
USACE successfully completes 101st Division Artillery Maintenance Facility
3/25/2025
The U.S. Army Corps of Engineers announced the completion of the Medium Tactical Equipment Maintenance Facility at Fort Campbell, Kentucky, with a ribbon-cutting ceremony, Feb. 25, 2025. This $30.6...

Feature Stories

Results:
Author: AnnMarie R. Harvie
Clear
  • May

    New England District, contractor complete work on Bearskin Neck Stone Jetty

    Repair work to the Bearskin Neck Stone Jetty in Rockport, Massachusetts is complete.  “Despite being hit with a harsh winter that included Winter Storm Juno, field work was completed on the Bearskin Neck Jetty repairs, Rockport, Mass., two days before Memorial Day Weekend,” said Project Manager Stephen Dunbar.The work on the $3.3M project consisted

SocialMediaTabs