Place temporary and permanent fill below the ordinary high-water mark of the Kennebec River at Waterville, Maine in order to replace the existing Ticonic Bridge. The replacement would result in
approximately 1,820 s.f. of permanent and 59,810 s.f. of temporary riverbed impact. Two-lane temporary traffic flow eastbound is expected to be maintained.