The work involves the replacement and rehabilitation, respectively, of the Greater Utility District’s existing 8” and 20” parallel cast iron sanitary sewer siphons (pipelines) and the installation of a new 16” water main and a new 16” sewer siphon beyond the mean high water line and buried below the