June 2015 - Upstream limits of Phase 1 Construction
Edge of the cleared phragmites line is the approximate location of the Flow Restriction Control Structure (FRCS) – about 100’ upstream of the existing Riverway Intake Structure – end June 2015.

Download Image: Full Size (1.34 MB)
Tags: muddy river
Photo by: Ed Buczek |  VIRIN: 150630-A-KF207-001.JPG

Accordion Menu