Muddy River Flood Risk Management project precast concrete culvert
Precast concrete culvert section being lowered into position on the pile cap against an already placed culvert section for the Muddy River Flood Risk Management project, Boston, Massachusetts.

Download Image: Full Size (0.43 MB)
Photo by: U.S. Army Corps of Engineers |  VIRIN: 150316-A-BJ146-370.JPG

Accordion Menu