Muddy River Flood Risk Management project precast concrete culvert
Precast concrete culvert section being lowered into position onto the concrete pile caps as part of the Muddy River Flood Risk Management project, Boston, Massachusetts.

Download Image: Full Size (0.61 MB)
Photo by: U.S. Army Corps of Engineers |  VIRIN: 150316-A-BJ146-369.JPG

Accordion Menu