New England News Releases

USACE, MassDOT, and FHWA Sign Agreement for Sagamore Bridge Replacement
10/4/2024
The U.S. Army Corps of Engineers (USACE), Massachusetts Department of Transportation (MassDOT), and the Federal Highway Administration (FHWA) have signed a Memorandum of Agreement (MOA) for the...
PUBLIC NOTICE OF INTENT TO CONDUCT A FIVE-YEAR REVIEW OF THE OSBORNE POND FORMERLY USED DEFENSE SITE (FUDS) AT JOINT BASE CAPE COD
8/27/2024
Interested parties are hereby notified that the U.S. Army Corps of Engineers, New England District (USACE) is conducting a five-year review (FYR) of the Osborne Pond Formerly Used Defense Site (FUDS)...
HOP BROOK LAKE RECREATION AREA TO REMAIN CLOSED FOR 2024 SEASON
8/26/2024
The U.S. Army Corps of Engineers, New England District announced that the recreation area at Hop Brook Lake will remain closed to vehicle access for the rest of the 2024 season, through the official...

Top Rotator

Local bird watchers descended upon West Hill Dam armed with pen, paper and a few binoculars to participate in West Hill Dam’s annual Backyard Bird Count.
Construction of the System Management Engineering Facility (SMEF), the 40,000 square foot, 2-story addition, is well underway and progressing rapidly.
For vessels wanting to enter Plymouth waters, dredging to remove shoals from the Plymouth Harbor federal navigation project in Massachusetts is currently underway and on schedule.

News From Around the Corps

LA District, county partners share updates, best practices at annual meeting
11/22/2024
Representatives from seven Southern California counties met with U.S. Army Corps of Engineers Los Angeles District partners to share updates and best practices Nov. 7 at the LA District Baseyard...
U.S. Army Corps of Engineers Transatlantic Division Personnel Support Hawaii Wildfires Recovery
10/24/2024
Several staff members assigned to U.S. Army Corps of Engineers Transatlantic Division were activated to support U.S. Army Corps of Engineers response to the Hawaii wildfires...
Omaha District, tribally-owned company partner for Missouri River maintenance
10/15/2024
In a demonstration of collaboration and innovation, the U.S. Army Corps of Engineers, Omaha District, recently partnered with Flatwater Group to enhance maintenance operations along the Missouri...

Feature Stories

District Team assists with the rehabilitation of a hydropower plant in Liberia

CENAE, New England District
Published March 3, 2016

A team from New England District is consulting on the repair work currently underway on the Mount Coffee Hydropower Rehabilitation Project near Monrovia, Liberia.

The team traveled to Liberia in November 2015 and again from Jan. 24 to Feb. 2 to conduct a site visit of the project and the surrounding areas.

The invitation from the Millennium Challenge Corporation (MCC) came due to the outstanding efforts New England District put out to make one of their projects, the Nacala Dam Restoration in Nacala, Mozambique, such a success. MCC has entered into a 5-year economic development compact with the government of Liberia. The District is providing independent engineering advice and due diligence support to MCC.

When work is complete, the Liberian capital city, Monrovia, will receive their power from the project. In addition, Monrovia and nearby villages will have a reliable source of clean water.

Businesses in Monrovia are currently purchasing connections to generators from vendors. "Many people do not have much choice but to be in the dark after sunset," said Patrick Blumeris, Hydraulic Engineer on the project. :Since Monrovia is so close to the equator, this amounts to 10-12 hours per night."

According to Blumeris, there are approximately 950,000 people who stand to benefit from the cleaner water. "There are people who will receive water from the piped system we are planning to re-install, from the reservoir to the treatment plant and then pumped into Monrovia," he said. "For people around the lake, a separate set of water hand pumps is being installed. These should be able to find groundwater more easily than any other pumps, and should be cleaner than the widespread use of surface water which often gets muddy or goes dry in the dry season. There is also a possibility that there is sea salt in the water."

Blumeris said that the current water pipeline project would ensure that water comes from a less turbid source than the river itself, and it is hoped that 100 liters per capita per day will be provided to nearly one million people.

"Our project ends at the White Plains Water Treatment Plant, which is undergoing a renovation of its own under the Liberia Water and Sewer Commission," said Blumeris

The 20-meter high dam was built in 1966. During the civil war in 1990, the dam was not allowed to operate, resulting in a dam breach.

Because of the breach, 180 meters of material was eroded down to bedrock. Also, much of the electrical and mechanical equipment had either been stolen or destroyed.

Work to rehabilitate the dam and the power house will include but not limited to repairing the breached portion of the forebay dam and repairing the generator floors and columns of the power house to support the crane and turbine/generator equipment during erection and future maintenance.

As a result of their visits, the team came up with numerous recommendations in all areas of the $350+ million project, many of which were immediately implemented. It is anticipated that the project will be completed in August 2017.

Team members who are working this effort are Team Leader Siamac Vaghar, Geotechnical Engineer; Brian Head, Electrical Engineer; Patrick Blumeris, Hydraulic Engineer; Mike Penko, Biologist; and Matthew Tessier, Civil Engineer and Jeff Teller, Chief, Appraisal Branch, Real Estate Division.


Yankee Engineer newsletter

To view edition please click here.

November 2024 Cover for the Yankee Engineer

Past Issues

SocialMediaTabs