DAMOS Contributions are produced on a continuing basis to distribute monitoring information to interested individuals. Contributions are produced in paper copy, on CD compilations, and also available below in pdf format.

Executive Summaries are available by clicking on the Contribution #. The full report is available by clicking on the Contribution title.

Contrib #

Contribution Title

Index of DAMOS Contributions

Disposal Area Monitoring System Annual Data Report - 1978. Supplement F. New London Disposal Site

Disposal Area Monitoring System Annual Data Report - 1978. Supplement E. Brenton Reef Disposal Site

Disposal Area Monitoring System Annual Data Report - 1978. Supplement D. Massachusetts Bay Disposal Sites

Disposal Area Monitoring System Annual Data Report - 1978. Supplement C. Isle of Shoals Disposal Site

Disposal Area Monitoring System Annual Data Report - 1978. Supplement H. New Haven Disposal Site

Disposal Area Monitoring System Annual Data Report - 1978. Supplement I. Western Long Island Sound Disposal Sites

Disposal Area Monitoring System Annual Data Report: Proceedings of Symposium 14-15 May 1979. II. Biological Observations

Disposal Area Monitoring System, Overview of the Program

Standard Operating Procedure Manual for DAMOS Monitoring Activities. II

Disposal Area Monitoring System Annual Data Report - 1978. Supplement A. Rockland Disposal Site

Disposal Area Monitoring System Annual Data Report - 1978. Supplement G. Cornfield Shoals Disposal Site

Disposal Area Monitoring System Annual Data Report - 1978. Supplement B. Portland Disposal Site

Disposal Area Monitoring System Annual Data Report - 1978

Disposal Area Monitoring System Annual Data Report: Proceedings of Symposium 14-15 May 1979. I. Physical Measurements

007

Stamford-New Haven Disposal Operation Monitoring Survey Report

008

Management and Monitoring of Dredge Spoil Disposal and Capping Procedures in Central Long Island Sound

009

Chronological Records of In-Situ Physical and Biological Conditions Obtained by Diver Survey at the Central Long Island Sound and New London Disposal Sites

010

Changes in the Levels of PCBs in Mytilus Edulis Associated with Dredge Spoil Disposal

011

"Capping" Procedures as an Alternative Technique to Isolate Contaminated Dredge Material in the Marine Environment

012

Precision Disposal Operations Using a Computerized Loran-C System

013

Disposal Area Monitoring System Progress Report: March 15 - May 15, 1980

014

Disposal Area Monitoring System Progress Report: May 15 - July 30, 1980

015

Precision Bathymetry, Diving Observation and Sediment Description. Norwalk Disposal Operation Monitoring Survey Report: Post Disposal Surveys, April 1981

016

Deployment of Dredged Material Disposal Buoys at the Central Long Island and Western Long Island Sound Disposal Sites

017-1

Disposal Area Monitoring System Annual Report, 1980. Vol I. Physical Measurements

017-2

Disposal Area Monitoring System Annual Report, 1980. Vol II. Biological Observations

017-3

Disposal Area Monitoring System Annual Report, 1980. Vol III. Visual Observations

018

Interim Survey of Western Long Island Sound III Disposal Site

019

Baseline Survey of the Proposed Western Long Island Sound III Dredged Material Disposal Site

020

DAMOS Mussel Watch Program: Histological Studies of Mussels from Dredged Material Disposal Sites

021

DAMOS Muscle Watch Program

023

Site Selection and Baseline Surveys of the Black Rock Disposal Site for the Field Verification Program

024

Study of the Benthic Macrofauna at the Central Long Island Sound Disposal Site

025

Status Report: Disposal Operations at the Central Long Island Sound Disposal Site

026

Application of a Loran-C Control System to Disposal Operations at the Boston Foul Ground, January 11-February 2, 1983

027

Summary of Measurements Made at the WLIS III Disposal Site, January 1982 - January 1983

028

Interim Report on the Concentration of Trace Metals In Mytilus Edulis

029

DAMOS Cruise Report August-September 1983

030

OSV Antelope Cruise Report

031

Wave Climate Green Harbor, MA

035

Post-Disposal Survey of the WLIS II Disposal Site

036

Feasibility Study of the Disposal of Dredged Material at Morris Cove, New Haven Harbor

037

Wave Climate Green Harbor , MA

038

Results of Monitoring Studies at Cap Sites #1, #2 and the FVP Site in Central Long Island Sound and a Classification Scheme for the Management of Capping Procedures

039

Sediment Characterization New London (NLON) Disposal Site: March - April 1984 March - April 1984

040

Report Document Page

041

Dredged material Disposal Operations at the Boston Foul Ground, MA

042

Evaluation of the Effectiveness of Dredging on the Kennebec River, ME

043

DAMOS Mussel Watch Program, Eastern Long Island Sound Disposal Site and Portland Disposal Site Monitoring Projects, 1979-1981

045

Rhode Island and Southeastern Massachusetts Dredging Needs Survey, 1985-1995

046

Summary of Program Results 1981-1984. I. Overview of the DAMOS Program

046-2A

Summary of Program Results 1981-1984. II. Part A, Section I

046-2B

Summary of Program Results 1981-1984. II. Part B, Section II

046-2C

Summary of Program Results 1981-1984. II. Part C, Section III

046-2D

Summary of Program Results 1981-1984. II. Part D, Section IV

046-3A

Summary of Program Results 1981-1984. III. Part A, Section I

046-3B

Summary of Program Results 1981-1984. III. Part B, Sections II & III

046-3C

Summary of Program Results 1981-1984. III. Part C, Section IV, V, VI & VII

046-4A

Summary of Program Results 1981-1984. IV. Part A, Sections I, II & III

047

Field Verification Program, Monitoring Cruise on 19 March 1985

048

Standard Operating Procedure Manual for DAMOS Monitoring Activities. I

049

Field Verification Program, Monitoring Cruise on 26 June, 1985

050

Distribution of Dredged Material at the Rockland Disposal Site, May 1985

051

DAMOS Mussel Watch, Western Long Island Sound Disposal Site Monitoring Project, June 1, 1984 – June 1, 1985

052

Monitoring Surveys at the Field Verification Program (FVP) Disposal Site in 1985

055

Monitoring Surveys at the Western Long Island Sound Disposal Site, August and October 1985

057

Monitoring Surveys at the Central Long Island Sound Disposal Site: An Assessment of Impacts from Disposal and Hurricane Gloria

058

Buzzards Bay Disposal Site – Literature Review

060

Monitoring Surveys at the New London Disposal Site, August 1985 – July 1986

061

Seasonal Monitoring Cruise at the Western Long Island Sound Disposal Site, August 1986

062

Determination of Polychlorinated Dibenzo-P-Dioxins and Polychlorinated Dibenzofurans in FVP Sediment Samples

063

Monitoring Cruise at the Central Long Island Sound Disposal Site, July 1986

064

Monitoring Surveys at the Foul Area Disposal Site, February 1987

066

Monitoring Cruise at the New London Disposal Site, July 1987

067

Monitoring Cruise at the Cape Arundel Disposal Site, October 1987

068

Monitoring Cruise at the Central Long Island Sound Disposal Site, August and September 1987

070

Bathymetric Survey at the Cornfield Shoals Disposal Site, July 1987

071

Capping Survey at the New London Disposal Site, February 3, 1989

072

Monitoring Cruise at the Central Long Island Sound Disposal Site, July 1988

073

Monitoring Cruise at the Massachusetts Bay Disposal Site, November 1988 – January 1989

074

Monitoring Cruise at the Western Long Island Sound Disposal Site, November 1987

075

Analysis of Sediment Chemistry and Body Burden Data Obtained at the Massachusetts Bay Disposal Site, October 1987

076

Monitoring Cruise at the Western Long Island Sound Disposal Site, July 1988

077

Monitoring Cruise at the New London Disposal Site, August 1988

078

Monitoring Cruise at the Portland Disposal Site, January 1989

079

Preliminary Field Operations in Support of Disposal Site Designation in the Rhode Island Sound Region

080

Buzzards Bay Disposal Site Baseline Study, March 1990

081

Monitoring Cruise at Saco Bay Disposal Site, May 1990

082

Monitoring Cruise at the Cape Arundel Disposal Site May 1990

083

Monitoring Cruise at the Rockland Disposal Site, July 1989

084

Monitoring Cruise at the Cape Cod Canal Disposal Site and Springhill Beach Site, March 1990 – April 1990

085

Monitoring Cruise at the Western Long Island Sound Disposal Site, July 1990

086

An Investigation of Techniques Suitable for Field Extraction

087

An Intergrated, Tiered Approach to Monitoring and Management of Dredged Material Disposal Sites

088

Analysis of the Contribution of Dredged Material to Sediment and Contaminant Fluxes in Long Island Sound

089

DAMOS Capping Model Verification

090

Monitoring Cruise at the Cornfield Shoals Disposal Site, July 1990

091

Chemical Analyses of Sediment Sampling at the Massachusetts Bay Disposal Site 5-7 June 1989

092

Monitoring Cruise at the Massachusetts Bay Disposal Site, August 1990

093

Monitoring Cruise at the New London Disposal Site, June - July 1990

094

Monitoring Cruise at the Central Long Island Sound Disposal Site, July 1990

095

Sediment Capping of Subaqueous Dredged Material Disposal Mounds: An Overview of the New England Experience, 1979-1993

096

Monitoring Cruise at the New London Disposal Site, June 1991

097

Monitoring Cruise at the Central Long Island Sound Disposal Site, June 1991

098

Deep Water Capping

099

Monitoring Cruise at the Western Long Island Sound Disposal Site, July 1991

100

Monitoring Cruise at the Massachusetts Bay Disposal Site, March 31 - April 4, 1992

101

Bioaccumulation in Stage 1 Polychaetes/Oligochaetes: A Field Feasibility Study

102

Monitoring Cruise at the Western Long Island Disposal Site, July 1992

103

Sediment Core Chemistry Data Summary from the MQR Mound, August and December 1991

104

Recolonization of the Mill-Quinnipiac River Disposal Mound (MQR): Results of a REMOTS Survey, August 1992

105

Synthesis of Monitoring at the Cornfield Shoals Disposal Site, July 1991 to May 1992

106

Monitoring Cruise at the Cornfield Shoals Disposal Site, August 1992

107

Reconnaissance Survey of the Historical Bridgeport Disposal Site, August 1992

108

Monitoring Cruise at the Portland Disposal Site, July 1992

109

DAMOS Summary Report, 1985-1990

110

Bathymetric and Subbottom Survey at the Cornfield Shoals Disposal Site, July 8, 1994

111

Monitoring Surveys of the New Haven Capping Project, 1993-1994

112

Investigation of the Dispersion of Sediments Resuspended by Dredging Operations in New Haven Harbor

113

Monitoring Cruise at the Boston Lighthouse Disposal Site, August 1994

114

Monitoring Cruise at the Western Long Island Sound Disposal Site, August 1993

115

Baseline Survey of the Reconfigured Massachusetts Bay Disposal Site 14 Sept. 1993

116

Monitoring Cruise at the Massachusetts Bay Disposal Site, August 1994

117

Monitoring Cruise at the Central Long Island Sound Disposal Site, July 1994

118

Monitoring Cruise at the Central Long Island Sound Disposal Site, September 1995

119

Monitoring Cruise at the Western Long Island Sound Disposal Site, July 1996

120

Monitoring Cruise at the Central Long Island Sound Disposal Site, July 1996

121

Oceanographic Measurements at the Portland Disposal Site During Spring of 1996

122

Predictive Model for Sediment Transport at the Portland Disposal Site, Maine

123

The Portland Disposal Site Capping Demonstration Project 1995-1997

124

Monitoring Results from the First Boston Harbor Navigation Improvement Project Confined Aquatic Disposal Cell

125

Monitoring Cruises at the Western Long Island Sound Disposal site, September 1997 and March 1998

126

Ecological Monitoring of a Constructed Intertidal Flat at Jonesport, ME

127

Application of in situ UV Spectrometry for Characterization of Harbor Sediment

128

Monitoring Cruise at the New London Disposal Site, Volume 1, 1992-1998

129

Monitoring Cruise at the Morris Cove Borrow Pit

130

Observations of physical oceanographic conditions at the New London Disposal Site, 1997-1998

131

Monitoring Cruise at the Rockland Disposal Site, September 2000

132

Monitoring Cruise at the New London Disposal Site, Volume II, Seawolf Mound, 1995-1998

133

Monitoring Cruise at the New London Disposal Site, August 2000

134

Monitoring Survey at the Massachusetts Bay Disposal Site, Fall 2000

135

Monitoring Cruise at the Central Long Island Sound Disposal Site, September 1997 and March 1998

136

Monitoring Cruise at the Portland Disposal Site, Summer 2000

137

Monitoring Survey at the Tupper Ledge Disposal Site, August 2001

138

Monitoring Survey at the Western Long Island Sound Disposal Site, June 2001

139

Central Long Island Sound Disposal Site Synthesis Report, 1999-2000

140

Monitoring Survey at the Portland Disposal Site, August 2001

141

Monitoring Survey at the Machias Bay Disposal Site, July 2002

142

Monitoring Cruise at the Central Long Island Sound Disposal Site, June 2001

143

Monitoring Survey at the Mark Island Disposal Site, July 2002

144

Monitoring Survey at the Cape Cod Bay Disposal Site, August 2001

145

Physical Oceanographic Study at the Rockland Disposal Site, August 2001

146

Monitoring Cruise at the Morris Cove Borrow Pit, May 2002

147

The Massachusetts Bay Disposal Site Capping Demonstration Project, 1998-2000

148

Monitoring Survey Over Boston Harbor CAD Cell M19

149

Post-Storm Monitoring Survey at the New London Disposal Site Seawolf Mound, October 2002

150

An Investigation of Sediment Dynamics in the Vicinity of Mystic River CAD Cells Utilizing Artificial Sediment Tracers

151

Monitoring Survey at the Massachusetts Bay Rock Reef Site, Summer 2002

152

Monitoring Survey at the New London Disposal Site, June 2001

153

Dredged Material Fate Study at the Portland Disposal Site, 1998-2000

154

Impact of Dredged Sediment Disposal on Lobster and Crab Abundance and Movements at the Rockland Disposal Site

155

Monitoring Surveys of the Rhode Island Sound Disposal Site, Summer 2003

156

Monitoring Survey at the Rockland Disposal Site, September 2003

157

Monitoring Survey at the Cape Cod Bay Disposal Site, August 2003

158

Monitoring Survey at the Tupper Ledge Disposal Site, September 2003

159

Monitoring Survey at the Central Long Island Sound Disposal Site, September 2003

1-6

Stamford-New Haven Disposal Operations Monitoring Survey Report Baseline Surveys

160

Monitoring Survey at the Cornfield Shoals Disposal Site, June 2004

161

Monitoring Survey at the Western Long Island Sound Disposal Site, June 2004

162

Monitoring Survey at the Massachusets Bay Disposal Site, September 2004

163

Monitoring Survey at the Central Long Island Sound Disposal Site, June 2004

164

Monitoring Survey at the West Island Historic Site, August-December 2003

165

Stamford-New Haven North/Cap Site 2 Investigation, May 2004

166

Disposal Plume Tracking And Assessment at the Rhode Island Sound Disposal Site, Spring 2004

167

Disposal Plume Tracking And Assessment at the Rhode Island Sound Disposal Site, Summer 2004

168

Monitoring Survey at the Boston Harbor CAD Cell Site, August 2004

169

Evaluation of Field Bioaccumulation as a Monitoring Tool, December 2006

170

Monitoring survey at the Buzzards Bay Disposal Site at Cleveland East Ledge, June 2005

171

Monitoring Survey at the Muscongus Bay Disposal Site, Lincoln County, Maine, July/September 2005

172

Monitoring Survey at the Tupper Ledge Disposal Site, Union River Bay, Maine July/September 2005

173

Monitoring Survey at the Douglas Island Disposal Site, Outer Narraguagus Bay, Maine September 2005

174

Postdisposal Monitoring of Lobster Abundance at the Rhode Island Sound Disposal Site in 2005 compared to the 1999 Predisposal Survey

175

Field Verification Program (FVP) Disposal Mound Monitoring 2005

176

Monitoring Survey at the Rhode Island Sound Disposal Site July 2005

177

Baseline Bathymetric Surveys at the Central and Western Long Island Sound Disposal Sites, July 2005

178

Providence River and Harbor Maintenance Dredging Project Synthesis Report, August 2008

179

Monitoring Survey at the Portland Disposal Site, August 2007

180

Monitoring Survey at the New London Disposal Site, July/ August 2007


SR Reports