Related Items

Redirecting...

Regulatory/Permitting Public Notices

  • NAE-2017-00205

    Expiration date: 8/29/2017

    Niantic Bay Shellfish Farm has submitted a permit application to conduct work in the Niantic River, eastern portion of Squall Flats, northwest of Mago Point to install racks, bags, cages, trays and navigation aids for an existing shellfish lease.

  • NAE-2016-00974

    Expiration date: 8/29/2017

    Jean Paul Velotti has submitted a permit application to conduct work in Long Island Sound, south and southeast of Sheffield (CT) and Shea Islands to install lines, buoys, anchors and navigation aids for winter sugar kelp (Saccarina Lattissima).

  • NAE-2017-01739

    Expiration date: 8/8/2017

    15-DAY NOTICE -- The Appalachian Mountain Club has submitted a permit application to conduct work in the West Branch Pleasant River at Katahdin Iron Work, ME.  Fifteen Post Assisted Log Structures will be placed in the river in conjunction with the Atlantic Salmon rearing habitat enhancement

  • NAE-2016-02549

    Expiration date: 8/7/2017

    Maine Dept. of Transportation has submitted a permit application to conduct work in Houston Brook and adjacent freshwater wetlands located in Winn, ME. Work will consist of repairing a deteriorated culvert on RT 2.

  • NAE-2016-00017

    Expiration date: 8/17/2017

    The harbormaster for Town of Tisbury, MA has submitted a permit application to conduct maintenance dredging in Vineyard Sound and Lake Tashmoo Inlet Channel.

  • NAE-2017-00732

    Expiration date: 8/10/2017

    CPB2, LLC has submitted a permit application to conduct work in Portland Harbor, Portland, ME.  The work consists of redeveloping and expanding an existing recreational marina from  a 69 to 141-slip facility and associated waterfront re-development.

  • NAE-2006-02309

    Expiration date: 8/11/2017

    Mashpee Neck Marina has submitted a permit application to conduct work in Shoestring Bay. The work involves replacement of existing  bulkheads, boat ramp relocation, a boat wash, dredging, reconfiguration and expansion of existing float system, relocation of a existing fuel dock and other ancillary

  • NAE-2017-01092

    Expiration date: 7/17/2017

    Project SHARE has submitted a permit application to conduct work in the West Branch Sheepscott River, China, ME;  Narraguagus River, Devereaux, ME and Barrows Stream, Crawford, ME.  The work is in conjunction with the Atlantic Salmon Habitat And River Enhancement project.

  • NAE-2009-02719

    Expiration date: 8/3/2017

    Fairhaven Shipyard Companies, Inc., has submitted a permit application to conduct work in New Bedford Harbor to replace an existing floating dock.  The project will increase the upland service area of the shipyard.

  • NAE-2014-01260

    Expiration date: 7/26/2017

    Burlington Harbor Marina, LLC, of Burlington, VT, has submitted an application to place and maintain a new 160-slip, full-service, public marina facility in Burlington Harbor of Lake Champlain off Penny Lane in Burlington.