Regulatory/Permitting Public Notices

1 ... 8 9 10 11 12 13 14 15 16 17 ... 34


NAE-2016-00006 - 9/13/2016: This notice concerns guidance for compensatory mitigation for impacts to aquatic resources associated with Department of the Army permits in New England.  The Army Corps of Engineers New England District has periodically revised and updated its compensatory mitigation guidance, most recently July
Expiration date:

ATTACHMENTS:  


NAE-2016-01726 - 8/30/2016: 15-DAY NOTICE: The Town of Phillips, ME  has submitted a permit application for  proposed work in Warm Brook off Reeds Mill Road. The work involves placement of permanent and temporary fill below the ordinary high water line of Warm Brook in conjunction with the insertion of an open-bottom, 3-sided
Expiration date: 9/14/2016

ATTACHMENTS:  


NAE-1991-1909-M1 - 8/30/2016: State of Maine, Bureau of General Services, has submitted a permit application for work in freshwater wetlands off 2828 Bennoch, Old Town, ME.  The work involves the expansion of the Juniper Ridge Landfill.
Expiration date: 9/29/2016

ATTACHMENTS:  


Issuance of CT General Permits - 8/30/2016: The New England District, U.S. Army Corps of Engineers hereby announces issuance of the attached statewide Connecticut General Permits, pursuant to 33 CFR Part 325.5(c)(1) for minimal impact projects. The CT GPs replaces the prior statewide permit, which expired on July 15, 2016, with a series of
Expiration date: 8/19/2021


NAE-2010-02215 - 8/16/2016: The National Audubon Society has submitted eight projects for funding through the Connecticut In Lieu Fee (“ILF”) program.  Projects include Connecticut River Service Area; Housatonic Service Area; South Central Service Area; Southeast Coast Service Area; Southwest Coast Service Area; and Thames
Expiration date: 9/15/2016

ATTACHMENTS:  


NAE-2016-0390 - 8/9/2016: Charles Lagasse of Provincetown Marina LLC, has submitted a permit application to conduct work in the Provincetown Harbor.  The proposed work at Fisherman's Wharf includes pier work; dredging; and establishment of a reconfiguration zone.  The Marina also requests two (2) unauthorized structures
Expiration date: 9/9/2016

ATTACHMENTS:  


NAE-1998-02651 - 8/9/2016: The Town of Provincetown has submitted a permit application to conduct work in the Provincetown Harbor.  The proposed work at MacMillan Wharf includes two wave attenuators; North and South docks: and dredging to deepen the marina basin.  The town also requests ten (10) unauthorized structures on the
Expiration date: 9/9/2016

ATTACHMENTS:  


NAE-2007-02926 - 7/26/2016: The Massachusetts Department of Fish & Game (DFG) has submitted a prospectus to amend the Massachusetts In-lieu Fee Program Instrument.  The prospectus includes restoration of approximately ½ acre of eelgrass in Salem Sound and Boston Harbor to compensate for authorized impacts to waters of the
Expiration date: 8/25/2016

ATTACHMENTS:  


NAE-2004-4187 - 7/19/2016: The Town of Barnstable,  MA, has submitted a permit application for proposed work in Maraspin Creek, Barnstable Harbor and Sandy Neck.  This is a request for modification to the existing 2008 permit  to allow maintenance dredging of the Mid-Entrance Channel located in Barnstable Harbor.  The town
Expiration date: 8/18/2016

ATTACHMENTS:  


NAE-2014-01178 - 7/19/2016: 15-Day-Notice -- Portsmouth Naval Shipyard has submitted a permit application for work in the Piscataqua River, Kittery, ME to perform structural repairs and maintenance to the dry dock; berths 11, 12 and 13; dredging; and backfilling.  The purpose is restoration of the crane rail support structure
Expiration date: 8/3/2016

ATTACHMENTS:  