NEW ENGLAND DISTRICT

Home
Home > Media > News Releases

Public Affairs Menu


1 2

FILTER:
July, 2014


Col. Christopher Barron assumes command of U.S. Army Corps of Engineers, New England District

CONCORD, Mass. – In a Change of Command ceremony today at Faneuil Hall in Boston, Mass., District Commander Col. Charles P. Samaris passed the command flag, signifying change of command authority of the U.S. Army Corps of Engineers in New England, to new District Commander Col. Christopher J. [Read More]
Published: Jul-31-14

Work to start in September 2014: Corps of Engineers awards $1.2 million contract for emergency streambank protection in Middletown

CONCORD, Mass. – Construction of a project for emergency streambank protection along the Connecticut River in Middletown, Conn., will be completed under the terms of a $1,282,550.00 contract recently awarded by the U.S. Army Corps of Engineers, New England District.Work will be accomplished by RC & [Read More]
Published: Jul-30-14

Communities, Corps of Engineers observe 100 year anniversary of the opening of the Cape Cod Canal

CONCORD, Mass. – The U.S. Army Corps of Engineers, New England District, joined with local communities, groups and the Cape Cod Centennial Committee on July 29, 2014 to observe the 100 year anniversary of the opening of the Cape Cod Canal with a ceremony in Buzzards Bay, Mass. They marked the [Read More]
Published: Jul-30-14

Corps awards $438,000 contract for repairs to gate guide, fender timbers of the New Bedford Hurricane Barrier

CONCORD, Mass. – Repairs to the gate guide and fender timbers at the New Bedford-Fairhaven Hurricane Barrier in New Bedford and Fairhaven, Mass., will be completed under the terms of a $438,000.00 contract recently awarded by the U.S. Army Corps of Engineers, New England District.Work will be [Read More]
Published: Jul-29-14

Mechanical repairs to Vertical Lift Railroad Bridge completed at the Cape Cod Canal in Buzzards Bay

CONCORD, Mass. – Mechanical repairs to the Cape Cod Canal Vertical Lift Railroad Bridge in Buzzards Bay, Mass., were recently completed by a local contractor, according to officials from the U.S. Army Corps of Engineers, New England District.  Work was completed in April 2014 by contractor R. Zoppo [Read More]
Published: Jul-29-14

Command of the U.S. Army Corps of Engineers New England District to change on July 31st

CONCORD, Mass. – A Change of Command ceremony will be held on Thursday, July 31, 2014, in Boston, Mass., to mark the passing of command authority of the U.S. Army Corps of Engineers, New England District from District Commander Col. Charles P. Samaris to the new District Commander Col. Christopher [Read More]
Published: Jul-28-14

Massachusetts DOT seeks permit to discharge fill to replace bridge over Amethyst Brook in Pelham

CONCORD, Mass. – The Massachusetts Department of Transportation – Highway Division (MassDOT) is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the U.S. in conjunction with discharging fill material to replace a deteriorated bridge over the [Read More]
Published: Jul-22-14

Killingworth Cranberries LLC seeks Corps permit to discharge fill, reclaim area to plant cranberry bushes

CONCORD, Mass. – Killingworth Cranberries LLC is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the U.S. in conjunction with doing work and reclaiming area to plant cranberry bushes in Killingworth, Conn. The work includes the discharge of [Read More]
Published: Jul-22-14

Massachusetts DOT seeks Corps permit to discharge fill material to replace deteriorated bridge in Pelham

CONCORD, Mass. – The Massachusetts Department of Transportation – Highway Division (MassDOT) is seeking a permit from the U.S. Army Corps of Engineers, New England District to conduct work in waters of the U.S. in conjunction with discharging fill material to replace a deteriorated bridge in Pelham, [Read More]
Published: Jul-15-14

Hopkinton Lake Milfoil Treatment to Temporarily Close Elm Brook Park Beach & Area Boat Ramps

HOPKINTON, N.H. – The U.S. Army Corps of Engineers will temporarily close the swimming beach at Elm Brook Park on Monday, July 14th and Tuesday, July 15th while portions of Hopkinton Lake are treated for the invasive variable milfoil plant.  The Stumpfield Road Boat Launch off Route 202/9 in [Read More]
Published: Jul-08-14
1 2